 As you can see, our floor has been done! We’re going with a mid-grey matte finish polish on our concrete floor. No photos for now..We’ve got to wait a few days before we can go inside again. After that, appliances can come in, which is going to make things look pretty finished downstairs.

We’re at an estimated 3 weeks until completion now. It’s crazy to think we only started in December. It’s felt both long and short at the same time. These last 3 weeks will probably feel like the longest! So close now…

Since Monday, we’ve had a lot of ruckus around the place with sewer and water lines being connected by the city. The machinery they bring in makes you realize why it costs so much. Three days later, we’re all connected. We’re very happy that the city added more crews to take on the huge list of connections. Our timing couldn’t have been better, as they added crews soon after we were put on the waiting list. It was the difference between waiting for 3 weeks, or waiting for as long as 18, which would have been pretty depressing. It just reveals how much construction is going on in this city. Dunbar street alone is incredibly chopped up right now, with entire sewer lines being replaced, and curbs, sidewalks and road paving being redone. It’s a little crazy around here, and here we are adding to it with our own construction.

Moving on, my Mom has already been doing a lovely job prettying up the place. Plants are moving out of ‘temporary storage’ (a.k.a. pile of dirt on the boulevard/pots on my parents’ deck) and into the new garden beds set up by the landscapers.

These guys have done a quality job and we’ve been anxious to see their work on the front yard now that the sewer line is done! Yesterday we were at this daunting stage:

And today I came home from work to this:

And this!

My mom has always wanted a more winding path leading up to the house in the front, so this was the opportunity to do it. I think it’s going to look quite lovely when everything is planted and the fence is in.

Here are a few more shots of things recently finished or in progress around here:

The recently finished garden bed in front of our laneway house, ready for new plants under the little birch tree. Our address numbers are on now too!

Pavers just went in for our entrance to the front door. Looking pretty!

Why the colour difference in pavers? We wanted to reuse the old pavers from the former garden patio, both to save money, and not have to use more new materials. This side of the house will not really be seen much so it worked out well.

This maple was bought by my parents in memory of my late grandmother. It’s had a tough time during construction, and these trees don’t like to be moved. Unfortunately it was unavoidable. Hopefully it proves to be resilient and continues to grow.

That about sums things up for now. We’re so close I can taste it!

Advertisements

2 Comments on “keep out!”

  1. Julie Favella says:

    It’s soooo exciting! I’m so happy for you guys.
    Love Auntie Julie

  2. farmtop says:

    Hi Tania and Scott,
    BCIT TV would like to interview you about your laneway house experience and motivations, to be aired on the Shaw network! Call or write me to let me know if you are available Monday morning. 604-681-6484 michael@smallworks.ca
    Cheers,
    Michael


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s